01 · Capacidade 01 · Capability

Cloud
Journey.

Cloud
Journey.

Migração e modernização para AWS, OCI e Azure. Da landing zone à sustentação 24×7. Especialistas em Oracle, SAP e workloads pesados que outros times preferem não tocar. Janela zero não é slogan — é ensaio com tráfego sintético antes do D-zero.

Migration and modernization to AWS, OCI and Azure. From landing zone to 24×7 run. Specialists in Oracle, SAP and heavy workloads other teams would rather not touch. Zero downtime is not a slogan — it is rehearsed with synthetic traffic before D-zero.

24projetos
Cloud Journey · concluídos
429migrações
Ledger DB/workload · desde 2011
99,98%
Uptime médio · retainer 12m
0
Lock-in. Saída em 30 dias.
24projects
Cloud Journey · delivered
429migrations
DB/workload ledger · since 2011
99.98%
Average uptime · 12-month retainers
0
Lock-in. 30-day exit.
01. Discovery
02. Landing Zone
03. Migração por ondas
04. Handover
05. Sustentação 24×7
01. Discovery
02. Landing Zone
03. Wave migration
04. Handover
05. 24×7 run
stack · ferramental stack · tooling AWSOCIAzureGCPTerraformAnsibleCloudFormationResource ManagerControl TowerTransit GatewayDirect ConnectFastConnectExpressRouteAWS RDSExadata CloudAuroraDataSyncDMSGoldenGateZDMCloudEndureIAM Identity CenterCloudWatchOCI Monitoring
01 · Discovery

2 dias. Fixo. Creditável no projeto.

Antes do plano, o inventário. Em 2 dias mapeamos contas, redes, dependências, licenciamento, janelas críticas e gargalos operacionais. Saímos com um relatório de 12 páginas — não com PowerPoint de 80 slides — e uma proposta com escopo, riscos e preço fechado.

  • 01

    Inventário automatizado

    Coleta via APIs do cloud + CMDB do cliente. Recursos, contas, redes, IAM, custo atual e tendência.

  • 02

    Mapa de dependências

    Workload por workload: integrações, dados sensíveis, latência tolerada, janela aceita pelo negócio.

  • 03

    Riscos & quick-wins

    Top-3 críticos · top-7 altos · top-12 médios. Lista de quick-wins entregáveis em 4 semanas sem tocar na arquitetura.

  • 04

    Roadmap em ondas

    Sequência de ondas, marcos, fallback ensaiado por onda. Sem janelas heroicas.

02 · Landing Zone

Blueprint que dura.

Landing zone não é produto, é decisão arquitetural de 5 anos. A gente desenha pensando em escala futura — não no primeiro workload.

  • 01

    Estrutura de contas & IAM

    Organizations/Tenancy + guardrails. SCPs testadas em ambiente espelhado.

  • 02

    Network

    VPC/VCN com segmentação por domínio de confiança. Transit gateway ou hub-and-spoke conforme volume.

  • 03

    Observability day-zero

    Logs, métricas e traces chegando antes do primeiro workload. Dashboards prontos.

  • 04

    FinOps desde o primeiro dia

    Tagging obrigatório, budget alerts, relatório mensal automático.

  • 05

    Stack de automação & IaC

    Terraform, Ansible, Argo CD, Kubernetes — escolhidos pelo problema, não pelo hype. Tudo versionado, tudo revisável, tudo reaplicável.

03 · Migração por ondas

Janela zero não é slogan.

3 ondas é o padrão, mas varia. O que não varia: cada onda tem fallback ensaiado antes do D-zero, em ambiente mirror com tráfego sintético. Se não ensaiou, não é ensaio — é palpite.

Onda 1 · dev & homolog
Calibra runbook
Onda 2 · periférico
Primeiro fallback
Onda 3 · core
2× ensaio · D-zero
04 · Handover

Sai sem ruído. Volta quando chamar.

30 dias de plantão silencioso: recebemos os alertas junto com o time do cliente, mas não respondemos primeiro. Só entramos se chamar. Dia 31 saímos de verdade — sem contrato de sustentação obrigatório.

Runbook

Público dentro do cliente. Na wiki deles, não na nossa.

Sustentação 24×7

Opcional. Se quiserem continuar, contrato separado.

01 · Discovery

2 days. Fixed. Creditable to the project.

Before the plan, the inventory. In 2 days we map accounts, networks, dependencies, licensing, critical windows and operational bottlenecks. We leave with a 12-page report — not an 80-slide PowerPoint — and a proposal with scope, risks and a fixed price.

  • 01

    Automated inventory

    Collection via cloud APIs + client CMDB. Resources, accounts, networks, IAM, current cost and trend.

  • 02

    Dependency map

    Workload by workload: integrations, sensitive data, tolerated latency, window the business accepts.

  • 03

    Risks & quick-wins

    Top-3 critical · top-7 high · top-12 medium. Quick-wins deliverable in 4 weeks without touching the architecture.

  • 04

    Wave roadmap

    Wave sequencing, milestones, fallback rehearsed per wave. No heroic windows.

02 · Landing Zone

A blueprint that lasts.

A landing zone is not a product, it is a 5-year architectural decision. We design with future scale in mind — not the first workload.

  • 01

    Accounts & IAM structure

    Organizations/Tenancy + guardrails. SCPs tested in a mirrored environment.

  • 02

    Network

    VPC/VCN segmented by trust domain. Transit gateway or hub-and-spoke based on volume.

  • 03

    Observability day-zero

    Logs, metrics and traces flowing before the first workload. Dashboards ready.

  • 04

    FinOps from day one

    Mandatory tagging, budget alerts, automated monthly report.

  • 05

    Automation & IaC stack

    Terraform, Ansible, Argo CD, Kubernetes — chosen by problem, not by hype. All versioned, all reviewable, all repeatable.

03 · Wave migration

Zero downtime is not a slogan.

3 waves is the default, but it varies. What does not vary: every wave has a fallback rehearsed before D-zero, in a mirror environment with synthetic traffic. If it wasn’t rehearsed, it is not a rehearsal — it is a guess.

Wave 1 · dev & staging
Calibrates runbook
Wave 2 · peripheral
First fallback
Wave 3 · core
2× rehearsal · D-zero
04 · Handover

Leave quietly. Come back when called.

30 days of silent standby: we receive alerts alongside the client team, but we don’t respond first. We only step in if called. Day 31 we actually leave — no mandatory run contract.

Runbook

Published inside the client. In their wiki, not ours.

24×7 run

Optional. If they want to continue, separate contract.

Cases recentes em CloudRecent cases in Cloud
2025·041 Empresa brasileira de telecomunicacoes (sob NDA) · indústria Redução de ~40% no custo Oracle RDS sem comprometer performance. Assessment de custo Oracle RDS combinando métricas AWS, comportamento de workload Oracle e classificação de criticidade. Identificou ~40% de redução de custo sem degradar produção. -40% custo Oracle RDS 2026 2025·099 Cliente Oracle (sob NDA) · indústria Oracle customer (under NDA) · industry Migration Readiness Assessment: saber antes de comprometer. Migration Readiness Assessment: know before committing. Assessment estruturado antes de comprometer migração. Avalia arquitetura, volume, downtime, dependências, performance, segurança, licenciamento, prontidão operacional. Structured assessment before committing to migration. Evaluates architecture, volume, downtime, dependencies, performance, security, licensing, and operational readiness. Go/No-Go critérios objetivos Go/No-Go objective criteria 2025 2025·068 Companhia aérea europeia (sob NDA) · indústria European airline (under NDA) · industry Otimização de custo AWS database em aviação. AWS database cost optimization in aviation. Otimização de custos AWS para workloads Oracle de companhia aérea. Análise de CloudWatch, padrões de workload, governança com times do cliente e parceiros. AWS cost optimization for airline Oracle workloads. CloudWatch analysis, workload patterns, governance across client + partner + Redgator teams. Multi-time governança Multi-team governance 2025
Cloud Journey

Discovery de 2 dias, fixo, creditável.

Relatório de 12 páginas. Sem PowerPoint de 80 slides.

Cloud Journey

2-day Discovery. Fixed price. Credited to the project.

12-page report. No 80-slide PowerPoint.